Next-Gen Smart Buildings.
Next-Gen Smart Buildings.
IBSS Project Gallery.
A snapshot of some of our Smart Building projects
ICONICS are proud to have supported Deloitte in delivering not only a space that forms the central hub of their new London campus, but the World’s first BREEAM Outstanding and WELL Certified Gold building that is both sustainable and entirely human-centred.
E.ON embarked on a project with ICONICS, delivered by Cougar Automation Ltd (a certified Gold partner of ICONICS), to allow E.ON to visualise and control its regional Energy Centres in one front-end, 64-bit solution from its brand new central control room in the heart of London.
At its opening, the T5 Terminal at the London Heathrow airport included over 50 different systems, producing a massive tag count of over 3 million, handled easily due to the robust nature of ICONICS HMI/SCADA software.
The University of Bristol is one of the top ranking universities in the UK composed of 25 academic schools. Wanting to integrate the campus buildings to provide a secure, future-proof centralised building management solution, the university turned to Cougar Automation Ltd. and ICONICS’ GENESIS64™.
Schiphol Airport selected ICONICS for their Building Management software to run on over 30 PLCs, while monitoring over 300,000 tags. ICONICS HMI/SCADA software, implemented by JCI Netherlands, runs on three Microsoft Windows terminal servers and allows all 30 operators to work on the system at the same time as they monitor HVAC, Fire, Security, Lighting, Telephone and Water Systems.
With over 6.5 million square feet under one roof, the Pentagon is the world’s largest office building complex. Using O&M Engineering, Inc. and ICONICS HMI/SCADA software to monitor HVAC, Fire, Security, Lightning, Water Systems, Hazardous Agent Monitoring and more, building control management is more user-friendly and effective for Pentagon Operators.
ICONICS paired its HMI/SCADA software with Vortechs Automation to provide Solebury School with pre-emptive alarming through a Centralised Control Room, full point-and-click control, improved Energy Efficiency, Building and Energy Management along with integration with existing Microsoft Windows XP and Windows Server 2003.
Founded in 1819 by Thomas Jefferson, the University of Virginia is made up of 11 schools in Charlottesville, VA, plus the College at Wise, spread out in over 500 buildings or facilities within 1,606 acres. The University offers bachelor’s, master’s, educational specialist, first-professional degrees (law and medicine), and doctoral degrees in a growing variety fields. The University of Virginia was named as the No. 2 best public university in the 2014 edition of the U.S. News and World Report.
The Peirce School is a public elementary school located in the town of Arlington, MA. The school is named after Captain Solomon Peirce, who served in the Revolutionary War. The original school building was built in 1924 and demolished in 2001. The current school facilities were built in 2003.
The City of Enid, Oklahoma, located 70 miles north of Oklahoma City, future-proofed their water operations by upgrading to 64-bit technology with GENESIS64™. The city’s water management services include production, distribution and reclamation.